Application Methods/Performance:Attic
Crawl Space: RValue Est. 16.8
Walls- Post Frame: RValue Est. 19.56
Walls with masonry, as shown: RValue Est. 3.7 or better
Metal Building Roof
Concrete Slabs: RValue Est. 1.1
Foilbuild Construction Grade Insulation Rolls
Reflective Bubble Insulation | Temp Shield
Four products Buy Online
FoilBuild II
1 layer heavy duty bubble, aluminum on 2 sides
$118.00/Roll 48"x125' - 500 sq ft/roll
FoilBuild II-1SP
1 layer heavy duty bubble, aluminum on 1 side
$108.00/Roll 48"x125' - 500 sq ft/roll
FoilBuild II-Double bubble
2 layers heavy duty bubbles, aluminum on 2 sides
$129.00/Roll 48"x100' - 400 sq ft/roll
Slitting of Rolls Available: 12" 16" 24"
Garage Door Insulation Kit 2 Car
4 rolls 24’ x 20’ Foil Single Bubble, foil 2 sides 1 Roll 185” of double sided Foam tape, 1 Disposable razor knife Price $58.00/kit
Foil Adhesive Tape
2" x 150' Pure Aluminium Tape $9.00/roll
Please contact us for phone orders. These items are in stock.
Installation Instructions
Unroll the FoilBuild II as you work, and cut it to suitable lengths. Allow for proper ventilation - see below. Staple FoilBuild II to the undersides of exposed rafters or between the trusses. Better ventilation in the attic increases comfort and helps the materials of your home last longer. Be sure not to block ventilation paths when you install FoilBuild II.
Installation Instructions
Check the crawl space to determine distance between floor joists- 16" or 24" on-center. Locate water pipes and heating ducts which hang below the floor joists. They will need to be insulated. FoilBuild II Pipe Wrap and Duct Insulation are designed specifically for this use. You do not need to wrap water pipes or duct work that fall between floor joists. FoilBuild II installed below will provide adequate insulating without wrapping them. Install starting at one end of the house and face staple FoilBuild II to the bottom of the floor joist. Leave enough length so the insulation can be pulled up to the band board and stapled. On the next run, face staple to the bottom of the floor joist. Overlap tabs and seal with our Foil Tape to create a vapor barrier. At the ends, staple up to the sub-floor or band board.
Installation Instructions
When main supports are installed, you may staple FoilBuild II 48" Insulation horizontally to the support beams. Overlap and tape seams and tape with our Foil Tape. Be careful to close gaps in the seams as they will cause air infiltration, which may cause condensation.
Installation Instructions
Install 1" x 2" wood furring strips on the bottom of and perpendicular to the Z purlins on 24" centers. Use sheet metal screws to secure the furring strips to the Z purlins. Overlap and tape furring strips together and tape. Staple tape for reinforcement. Use 48" wide FoilBuild II Insulation and staple to furring strips. You will not need to cut the FoilBuild II Insulation to an exact size before installing, since the insulation is below the Z purlins. Overlap and tape seams and tape together using Foil Tape. Gaps will cause air infiltration which may cause condensation. Prior to installation of FoilBuild II, inspect the roof area for clutter - water sprinkler systems, power lines and lights. Sprinkler systems are especially important. All water pipes must be below the insulation to prevent the possibility of freezing in the winter. In many instances, the FoilBuild II must be installed up near the roof deck.
Installation Instructions
Unroll FoilBuild II Concrete Slab Insulation over the sand or gravel, clear poly side facing up. Overlap and tape the seams. Seal the seams with 3" wide Poly Tape or duct tape. All tape should be applied firmly while assuring good adhesion. Install radiant heating then pour concrete over the clear poly as usual. Tip: Adding 1" of sand over the FoilBuild II Concrete Slab Insulation will facilitate water drainage and shorten the actual curing time.
Sizes (partial list)
12” x 125'
24” x 125'
30” x 125'
32” x 125'
48” x 125'
60” x 125'
64” x 125'
Also called FoilBuild II Tempshield or FoilBuild II Temp Shield
